Free Ride facilitated the installation of:provided by: Oxford House Band of IndiansWABODEN JCT
Two Level 2 EV Chargers 19.2KW*Site Active Nov 7, 2025no cost charging
(Pelican Landing, Grand Rapid, MB)
Free Ride facilitated the installation of:One 120 kW DC Fast Charger – 50KW setpointTwo Level 2 EV Chargers – 19.2* capableRooftop Solar Underway
Site Active Oct 9, 2025no cost charging
(Fairford, MB)
Free Ride facilitated the installation of:One 50 kW DC Fast ChargerTwo Level 2 EV Chargers78 kW Solar w BESS 212 kWh – 60 kW power
Site Active Feb 15, 2026sun > solar > battery > charger > car = Free Ride EVno cost charging